Solution & Results
To address these severe paraffin issues, Devon Energy installed three Enercat Tubing Tools below the Seating Nipple (SN) at approximately 10,121 feet Measured Depth (MD). The Enercat tools effectively prevent paraffin buildup by disrupting wax crystallization at a molecular level, thus eliminating the need for additional chemical or thermal remediation.
reduction in chemical and hot water treatments post-installation.
of production downtime related to paraffin issues following installation.
rod evaluations demonstrated completely clean rods without any additional treatments.