Solution & Results
Devon Energy installed three Synergetic Enercat Tubing Tools below the Seating Nipple at approximately 9,388 feet Measured Depth (MD). These tools address paraffin deposition by altering the crude fluid properties, significantly reducing wax appearance temperatures and preventing paraffin buildup without the use of conventional treatments. The installation of Enercat Tubing Tools resulted in notable operational improvements and efficiency gains:
of chemical and hot water treatments, with no paraffin-related downtime post-installation.
•
No paraffin buildup observed
as confirmed by rod inspections at 36 and 133 days and clean surface flow lines with consistently low pressures.
•
Extended maintenance intervals
with several years anticipated before any paraffin-related issues reoccur — significantly increasing equipment life